Friday, April 16, 2010

The Landscapers Arrive




















The first job was to make the station safe so fences and steps down to the street were completed. About the same time the newest industry arrived in town in the form of a saw mill owned by Mountain Top Lumber Company. A rail connection was made to receive logs and ship out sawn timber to the rest of the world.

























The track ballast for this siding is still waiting the return of the team as the yard had been completed. A train load of Blast from RIC is due soon.



























With all that done then the landscapers moved in and started to improve the look of the town.. The cement works was fenced off and some work was done around the silos and up to the Melbourne of the station. They are taking a shot break before continuing


























T364 is about to shunt the cement wagons into the silo siding for loading while T363 has a load of limestone ready to be unloaded. These are the new n track limestone cars

























This view shows the station and goods shed
























The landscaping around the Cement woks and silos. T364 heads the train loading cement






















The last picture today is T363 is ready to depart with the limestone cars while T379 waits to shunt its train of limestone cars into the siding

Tuesday, February 9, 2010

Busy Dayin North Mirboo


The day has been frantic in getting things done. Three construction crews have been busy all day. The first to arrive was the road crew but being a Mexican team things didn't always go to plan but by the end of the day the main roads were sealed. As the old motto goes build a road and the cars will come and so will the traffic jams and the cops. By the end of the day still no cars Maybe because it was 35 degrees they went to the beach.

While the road crew was busy the railway contractors returned to set up the station and install a building to control things. The building was a left over from New South Wales and arrived slung under a Chinook helicopter. It was positioned on its piers but as the day sped by they didn't get the platform fence done or the steps down to the street. They will be back soon to finish off the job. As the hotel was closed for the day no one hung round after work.

The shops are all stocked and ready to open when there are some people to come and buy. Its all up to the cement works to get up and running

























The Crown Hotel


























The other hard working team that day belonged to the cement works. They were setting up the cement loading and unloading bay at the silos. It involved a lot of cementing but in their usual efficiency the job was completed mid afternoon. It looked good . By 3pm the works was deserted. Their next job is to build a limestone unloading facility.





The weather has closed in and it is unlikely much will get done in the next day or so. This is the supervising Manager signing off for tody

Thursday, February 4, 2010

Trial Operations

Monday saw the influx of B class locos all fitted with their computer upgrades. All were testing how well the track construction crew went. It was a disaster. The track test operations ceased after a few derailments took up all the overtime for the Breakdown crew' The construction crew didn't read their plans and mixed heavy rail with lighter track and joined them on a corner.
At the convention were B61 (SSR), B62 (Blue & Gold), B65 (Auscision), B74 & B82 (Orange & Grey) and B84 (Orange). Gate crashing the convention were Bi-centennial B66 and Y137. Three A class sent their apologies' A good day was had by all and a tour of the underground operations centre was undertaken. It was built there in case of terrorist attacks, They will never find them under the track.

ABunnings special supplied bunker. (Well at least the brackets and screws)

The track crew were dragged back today under threatening cloud and put to work. It wasn't long before the heavy rail was dragged away and in came the lighter rail and with the whip cracking the finished the job in one day.

Now the great wise people need to attrack workers to the town as well as some more business. They will need to water the ground to get some greenery going. Who wants to live in a dust bowl. The end of this entry the track constudtion crew submitted two photos of their work

Entry to the fiddle yard
Fiddle Yard complete

Tuesday, January 26, 2010

Australia Day

What a difference a couple of days can make. The track laying gang is heading off for a break and will be back to lay two more sidings when their location can be agreed upon. The weeds have still to grow although a few buildings have grown quickly.

The sub terrain crew has been busy rolling out the cables to get things going. They worked so hard that all the work has been done and there were only two bugs to sort out and kill. Just as the sun was setting in the west and before the fireworks an A class arrived on a test run. Note the new hotel that was built by the night shift



It quickly disappeared and came back with a goods train. That was followed by a Y class hauled pass train from Melbourne. It didn't stay long before it left on its return run



The construction crew are having a couple of days off in appreciation of their enthusiastic work

Friday, January 22, 2010

The Next Day


As the bare earth was cooling and before weeds were invented suddenly a track laying gang appeared. This was the starting point for the branch restoration. The two points set the mood for the rapid advancement of the connection to the outside world . The next picture shows that important event

Then all of a sudden two items of rolling stock blew on on a north easter from NSW as test equipment . The track gang had been busy continuing to lay track so that by the end of the day a lot had been achieved. The next two photos round out the day


It will be exciting days ahead.

Thursday, January 21, 2010

Creation

Southern Cement has just built a new cement plant in southern Victoria (Australia). Fortunately it was located at a closed VR branch line to North Mirboo resulting in a reopening of the line and introduction of general freight and passenger services. There will be a photo essay of the model and its development until the line closes. Keep coming back for updates

In five days the earth was made and ready for life. When it gets dark then the great sky lights brightens the place up




Now get ready for the first signs of life (Forget Adam & Eve they just don't rate)


On the next day appeared the Cement works building and a passenger train ready to make its first run. The landscapers are running way behind schedule.

Everything is ready for the big expansion tgay tuned